Pre-commissioning preparation is essential to ensure a smooth and successful commissioning process. It involves gathering necessary information such as system design, water quality data, and local regulations, which helps to identify potential issues and develop a comprehensive commissioning plan. This preparation also enables the identification of necessary resources, personnel, and equipment, reducing the risk of delays and cost overruns during commissioning.